All articles
Tuesday, 04 March 2014
3.8 engine first start
- Article Details
I made it myself....almost.
https://www.youtube.com/watch?v=YIi_xmfbKpM
Read moreSaturday, 01 March 2014
Front suspension
- Article Details
I can see why the Gaz adjustable shock absorbers upset the purists...
Read more
Thursday, 27 February 2014
Relay
- Article Details
Relay (noun).
An electrical device that prevents current from reaching the device it is attached to, regardless of attempts to get it to do otherwise.
Damn you Mr Lucas.
I did eventually work out what the problem is; it's the wrong relay. Once there was power to both C2 and W1 all was good with the world.
Read more
Saturday, 22 February 2014
Spark plug leads
- Article Details
As it turned out, this was a hell of a lot more difficult that it looks.
Read more
Sunday, 02 February 2014
January's efforts
- Article Details
Work over the last month or so has been sporadic. Most of the engine bay is done and so it's just having the discipline to finish off the little jobs, and moreso to blog it.
Here's a photo selection.
Lovely new otter switch hole cover made for me by Alan Turner.
New battery support.
Brake fluid reservoirs with natty yellow striped hose.
Spin on adapter and original carb overflow pipe bracket.
Suspension on!
Beautiful plating.
Martin bought me this coil so it better work!
Doors. Will have to hang them soon.
Fan relay.
Pretty brass manifold nuts.
Horn relay. The Autosparks loom is really beautiful.
Shiny Bell stainless exhaust. The one for my 4.2 fitted well but I had to trim the engine downpipes about an inch on this one. Still easy to fit.
Read more
Monday, 09 December 2013
Vale Martin Hawes
- Article Details
Yesterday my friend Martin was killed while driving his beloved MGTC.
Martin was a kind and gentle man who gave freely of his time and knowledge. He was quick with an anecdote and was always laughing.
He helped me and taught me a lot. Those familiar with this blog will recognise him in many of the photos. He will be sorely missed.
Read more
Saturday, 23 November 2013
Engine and JT5 gearbox installation
- Article Details
Finally the time has come to put the engine back in. The unknown quantity was the JT5 box, and how much this would complicate the installation.
Prior to starting I measured the JT5 and my Moss box. They are both 66cm long, although this is without the slip yoke fitted into the JT5 box, which adds a minimum of 6cm. The installation instructions warn against trying to install the gearbox with this fitted. It is recommended to attach the yoke to the driveshaft and install them in the tunnel before offering up the gearbox.
I have only ever installed engines from below, and this is how we planned to do it. I am fortunate to have a car hoist which makes the process a good deal easier.
With the engine on a trolley positioned under the car we lowered the body. It quickly became apparent that there was not much spare space; with the waterpump pulley a few mm clear of the picture frame the back of the gearbox was only about 10mm clear of the tunnel. Despite this we were able to get the engine in place on the engine mounts with a bit of judicious wiggling.
It quickly became apparent however that there was not going to be enough room to get the slip yoke into the gearbox. Detaching the driveshaft from the differential didn't provide enough leeway either. Whether installing the engine from above using an engine crane and angling it down would have made it possible to install the yoke is an interesting question.
After some discussion we decided to remove the IRS to give us enough room to manipulate the driveshaft into place. Even having done this it was still very difficult to get the splines to mesh and in the end we disconnected the slip yoke from the driveshaft and installed it by putting an arm up the tunnel much like a vet in calving season. Then the driveshaft was bolted back onto the yoke and the IRS reinstalled. Although it sounds complicated the removal and replacement of the IRS took about 20 minutes and was unavoidable.
When we fitted the engine steady bar it was not vertical. After some measurment it seems that the engine is actually fitted in the correct place and that the mounting holes drilled in the bell housing are about 10mm too far back. Given the heavy duty gearbox mount that comes with the JT5 box this shouldn't pose a problem but it is disapointing.
With the engine and gearbox installed it became apparent just how tight a fit the JT5 is. In many areas the clearance from the bodywork is only a couple of mm. "Some peening of the tunnel may be required" says the manual...
The supplied cables for the reversing light switch are jammed up hard against the tunnel. There is very little room to access the gearbox filler plug; around 25mm clearance will make removing the plug and filling the box tricky.
I am concerned at the lack of clearance particualrly around the bulkhead corners and the sides of the top plate. It will be quite hard to relieve these areas without changes that will make fitting the tunnel cover difficult. Depending on the amount of movement allowed by the gearbox mount it may be necessary to pack these tight gaps with some sort of rubber cushioning to stop rattles.
In summary then the JT5 box will go in but not without removing the IRS if you want to put it in from below. It might be possible to get it in from above by tilting the gearbox down and manipulating it back on the slip yoke but this would be hard with a gearbox filled with oil as it will spill out of the unsealed hole around the output shaft.
In comparison we installed a Driven Man box in a 3.8 coupe 2 weeks ago. This has the same fixed yoke as the standard box and while it is also a tight fit it was a much easier installation.
Read more
Saturday, 16 November 2013
Engine delivery
- Article Details
Don't worry about those dirty old cam covers; the newly polished ones are just waiting until the engine is safely installed.
There's always something else to buy...
Read more
Saturday, 26 October 2013
Shimming the tappets
- Article Details
Setting the valve clearances on the XK head is a time consuming process that requires patience. I have finished mine. It took me about 4 hours, never having done this before. Each side had to be pulled down about 4 times. I'm pretty satisfied though and the inlets are all 4 or 5 thou, and the exhausts 6 or 7. Once the Cometic head gasket arrives the head can go on, and it's done!
Rather than taking photographs of this process, instead have a look at what you get for $50 for an XK head. This is off a 420, and seems to have been stored in a dam.
Read more
Saturday, 19 October 2013
Engine building 3: timing
- Article Details
Time for the timing chains.
Everything has been beadblasted.
Locktabs.
Gaskets for the new chain cover.
Teflon front seal.
Cover on.
Sump on.
Damper on.
Fuel sender in.
Read more